Project Background
The Pinecrest Canyon Road pavement project will rehabilitate the existing roadway surface by removing and replacing the top layer of asphalt. In addition to the paving work, drainage improvements will be constructed at the Henderson Spring, over a section of the road just before the hunting area parking lot. Finally, the roadway at approximately 2239 East will be entirely reconstructed, and the pipe under the road will be replaced (see map below).
Project Schedule
Information for the construction project will be delivered via CodeRED. Please make sure you are signed up and your address geo pin is in the correct location. More information to come.
Project Impacts
Due to the size of the paving equipment, and the movement of heavy vehicles (dump trucks, etc.) up and down the canyon, the road may need to be closed for periods during the day. We will work with the contractor to provide as much information so that you are informed.